Project name: 72TPD Two Stage RO Seawater Desalination Equipment for Offshore Converter Stations
Project location: Guangdong offshore wind power flexible direct transmission project offshore converter station
Project purpose: To provide stable and high-quality industrial water, while meeting the demand for domestic water, ensuring the normal operation of equipment and the basic life of personnel.
Project scale: 72 tons/day (3000L/hr), 2 set.
Produced water quality: <20mg/L
Equipment process flow:
Feep pump – MMF – Precision filter – 1st High pressure pump – 1st RO system – Middle water tank – 2nd High pressure pump – 2nd RO system – Product water tank
Project background:
The offshore converter station project is equipped with a deep-sea offshore wind farm, which is planned and constructed by Guangdong Power Grid. It is the world’s first large-scale integrated sea land ultra-high voltage flexible straight project, planned to be completed and put into operation in October 2026.
For more product details:




